-
Morgan
Posts
Sub-Slab Injection Grid: Nonrepellent Termiticide Strategy
Post construction sub-slab injections target subterranean termite pathways that can bypass perimeter treatments and stop active colonies from entering a structure. For effective post construction…
Crawlspace Soil Termiticide Borate Vapor-Barrier Fixes
Treating crawlspace soil and exposed wood after construction is essential to stop termites before they spread into the home. Start by treating the crawlspace perimeter…
Bait+Liquid Termite Sync: Colony Cutoff Tactic
Post construction termite control is most effective when baiting and liquid soil barriers are integrated into a coordinated strategy for high risk sites. Start by…
Expanding Foam Termiticide Gallery Injection Guide
Post-construction termite treatment with expanding foam termiticides is essential when active colonies are hidden in inaccessible voids and wall cavities. Use a non-repellent, expanding foam…
Whole House Sulfuryl Fluoride Tent Fumigation Guide
Whole-structure tent fumigation with sulfuryl fluoride is the definitive post construction treatment when drywood termites have extensively infested a home. When infestation is widespread the…
Spot Heat Fumigation Wood-Core Thermocouple Protocols
Spot heat treatment raises interior wood temperatures to lethal levels and kills drywood termites without full-structure tenting. For localized post construction termite treatment using heat,…
Stainless Mesh Sand Barrier Retrofit For Termites
Consider retrofitting physical barriers like stainless-steel mesh and graded sand as a long term, non chemical post construction termite treatment option. When retrofitting stainless-steel woven…
Mud Tube Exposure Soil Treatment Checklist For Termites
Visible mud tubes on foundation or framing mean subterranean termites are actively feeding and need targeted post construction treatment now. Start by carefully removing the…